Additional costs:
- report and graphical scheme of deviations
- wall sweeps
- views, sections
- 3D and BIM model
- ceiling plan
- layout of electrics (sockets, power panels, cable outlets)
- plan of lamps and switches
- plan of the plumbing equipment
- water supply and sewerage plan
- heating plan
- air conditioning system plan
- facade blueprints
- photo and video recording
- photo panoramas of the object
- coloring a point cloud
The cost may be increased in the following cases:
- furniture, construction waste, curtains and other similar things are in the facility
- people or animals are constantly in the facility
- lack of lift
- pitched roof
* in such situations, the cost increase is from 30%