Additionally paid:
- plans with determined tree species
- a list of trees and shrubs indicating their characteristics
- views, sections
- 3D landscape model
- topographic plans
- utility network plans
- urban infrastructure plans
- determination of the bulk materials volume
- determination of soil excavation volumes
- photo and video recording
- photo panoramas of the object
- coloring a point cloud
The cost may be increased in the following cases:
- construction waste, construction and covering materials, other obstacles are on the scanning site
- people and animals are constantly on the scanning site
* in such situations, the cost increase is from 30%