Additionally paid:
- graduating tanks
- determination of tank deformation
- report and graphical scheme of deviations
- wall sweeps
- views, sections
- 3D and BIM model
- orthophotoplans of facade structures and indoor premises
- photo and video recording
- photo panoramas of the object
- coloring a point cloud
The cost may be increased in the following cases:
- the presence of pipelines, stiffeners, staircases and other objects occupying a certain volume in the tank, which must be taken into account for building graduation tables;
- scaffolding, construction waste, construction and covering materials, other obstacles are on the scanning site
- people and animals are constantly on the scanning site
* in such situations, the cost increase is from 30%